Monday, 23 November 20263 stories in today's edition
Roads & transport, Daudkandi

Fault in Meghna-Gumti Bridge, Chattogram-bound lane closed in Cumilla

Monday, 23 November 2026, 3:45

Fault in Meghna-Gumti Bridge, Chattogram-bound lane closed in Cumilla

A fault has been found in the bearing pad of the Chattogram-bound bridge over the Meghna-Gumti River in Daudkandi, Cumilla, on the Dhaka-Chattogram highway. Due to excessive vibration felt on the bridge, vehicular movement on its two lanes has been suspended for safety reasons. As an alternative, authorities have arranged for both Dhaka and Chattogram-bound vehicles to use the adjacent new bridge.

The two lanes of the old bridge have remained closed since Sunday (November 22) afternoon. Abdur Rahim, executive engineer of the Narayanganj Roads and Highways Department responsible for the Daudkandi toll plaza and bridge maintenance, confirmed the matter. He stated that the two lanes were closed as a precautionary measure due to excessive vibration in the Cumilla section of the Chattogram-bound bridge.

A team of experts will inspect the bridge on Monday (November 23). Following their observations, it will be possible to determine the nature of the fault and the time required to complete the repair work. To keep traffic flowing, arrangements have been made for vehicles from both directions to cross via the adjacent two-lane new bridge.

Reported by 13 outlets. See the original sources below for full details.

This summary was generated automatically from the original reports. Check the original sources for full details.

More on this topic

Daudkandi: more stories