A fault has been found in the bearing pad of the Chattogram-bound bridge over the Meghna-Gumti River in Daudkandi, Cumilla, on the Dhaka-Chattogram highway. Due to excessive vibration felt on the bridge, vehicular movement on its two lanes has been suspended for safety reasons. As an alternative, authorities have arranged for both Dhaka and Chattogram-bound vehicles to use the adjacent new bridge.
The two lanes of the old bridge have remained closed since Sunday (November 22) afternoon. Abdur Rahim, executive engineer of the Narayanganj Roads and Highways Department responsible for the Daudkandi toll plaza and bridge maintenance, confirmed the matter. He stated that the two lanes were closed as a precautionary measure due to excessive vibration in the Cumilla section of the Chattogram-bound bridge.
A team of experts will inspect the bridge on Monday (November 23). Following their observations, it will be possible to determine the nature of the fault and the time required to complete the repair work. To keep traffic flowing, arrangements have been made for vehicles from both directions to cross via the adjacent two-lane new bridge.
Reported by 13 outlets. See the original sources below for full details.
This summary was generated automatically from the original reports. Check the original sources for full details.
Attempt to sabotage by cutting trees on Dhaka-Chattogram highway in Chauddagram
Comilla University bus saved from arson attempt by driver's wisdom
Daudkandi river port will open new doors of development: Khandaker Maruf
Youth killed after falling from motorcycle in Daudkandi
16 Chhatra League activists arrested in Daudkandi
2 arrested with 672 bottles of cough syrup hidden in ambulance in Daudkandi
5 burned in CNG cylinder blast in Daudkandi