Long-standing suffering is set to end for thousands of people in Puthia upazila of Rajshahi and Naldanga upazila of Natore. An initiative has been taken to modernize the approximately eight-kilometer road from Taherpur Bazar to Naldanga, which remained in a dilapidated state due to a lack of maintenance and repair. The cost of implementing this project has been fixed at 15 crore 81 lakh 91 thousand 428 taka.
On Wednesday afternoon, the foundation stone for the construction work of the road was officially laid in the Taherpur Bazar area of Puthia. Member of Parliament for Rajshahi-5 (Puthia-Durgapur) and member of the Parliamentary Standing Committee on the Ministry of Fisheries and Livestock, Professor Nazrul Islam Mondal, inaugurated the activity as the chief guest.
According to the upazila engineering office, the modernization work of the nearly eight-kilometer road from Taherpur Bazar to Naldanga will be carried out by the contracting firm Varendra Construction Limited. The tentative time for the completion of the construction work has been set for March 2028. The long-standing demand of local residents to repair and modernize the road has begun, bringing relief among the locals.
Reported by 4 outlets. See the original sources below for full details.
This summary was generated automatically from the original reports. Check the original sources for full details.
Natore highways turn into death traps with 70 deaths in six months
Structures rising on RHD land along Natore-Bogura highway
ACC investigates irregularities in road repair in Natore
2 motorcycle riders killed in tractor crash in Natore
Four homes burned in Naldanga fire, UNO provides aid
Fugitive convict arrested in Naldanga
Six cocktails recovered in abandoned condition in Natore
Juba Dal leader's child killed in Naldanga road accident